Green River - LaBarge Daily Average Forecast Flow (ending 12z on given date) Units: CFSD Created: June 07 2017 DAILY TOTAL: deterministic forecast flow (official forecast on CBRFC website) ESP TOTAL: 50% exceedance forecast flow based on climatology DATE,TOTAL, 2017-06-08,14499,Daily Model Output (20170607) 2017-06-09,15191 2017-06-10,15696 2017-06-11,16177 2017-06-12,16993 2017-06-13,17288 2017-06-14,16260 2017-06-15,14253 2017-06-16,11675 2017-06-17,9676 2017-06-18,10928,ESP Model Output (20170606) 2017-06-19,10339 2017-06-20,9947 2017-06-21,9885 2017-06-22,9706 2017-06-23,9620 2017-06-24,9500 2017-06-25,9240 2017-06-26,8955 2017-06-27,8907 2017-06-28,8851 2017-06-29,8767 2017-06-30,8442 2017-07-01,8124 2017-07-02,7989 2017-07-03,7737 2017-07-04,7555 2017-07-05,7194 2017-07-06,6875 2017-07-07,6478 2017-07-08,6213 2017-07-09,6026 2017-07-10,5865 2017-07-11,5553 2017-07-12,5286 2017-07-13,5188 2017-07-14,5039 2017-07-15,4786 2017-07-16,4670 2017-07-17,4473 2017-07-18,4280 2017-07-19,4007 2017-07-20,4023 2017-07-21,3885 2017-07-22,3767 2017-07-23,3523 2017-07-24,3260 2017-07-25,3289 2017-07-26,3255 2017-07-27,3127 2017-07-28,3080 2017-07-29,2938 2017-07-30,2833 2017-07-31,2736 SPECIFIC SITE NOTES: GENERAL NOTES: - Days 1-10 are from the CBRFC deterministic model. This uses 5 days of precipitation forecasts and 10 days of temperature forecasts. These are updated daily and will change as the weather forecast changes, so there is increasing uncertainty past days 3-5. - Days 11 and beyond are from the Ensemble Prediction Model (ESP). This model is driven primarily by climatology for the 1981-2015 period. This guidance is probabilistic and used the 50% exceedance value. It is best to use this as a possible pattern of flow into the future as opposed to an exact value that will occur. - An abrupt change in guidance may occur at the switch from the daily model to the ESP model, some possible reasons are: - The daily model is using a temperature forecast that is either much above or below normal before reverting to normal temperatures in ESP. - If there is regulation (reservoirs, diversions, etc.) above the forecast point there may be differences between the two runs in how they are being handled. Please check with CBRFC forecasters for details on specific forecast points.