Green River - LaBarge Daily Average Forecast Flow (ending 12z on given date) Units: CFSD Created: June 08 2017 DAILY TOTAL: deterministic forecast flow (official forecast on CBRFC website) ESP TOTAL: 50% exceedance forecast flow based on climatology DATE,TOTAL, 2017-06-09,15856,Daily Model Output (20170608) 2017-06-10,16854 2017-06-11,17456 2017-06-12,18033 2017-06-13,18385 2017-06-14,17860 2017-06-15,16937 2017-06-16,15512 2017-06-17,13314 2017-06-18,11276 2017-06-19,9535,ESP Model Output (20170607) 2017-06-20,9825 2017-06-21,10018 2017-06-22,9969 2017-06-23,9702 2017-06-24,9374 2017-06-25,9099 2017-06-26,8823 2017-06-27,8871 2017-06-28,8831 2017-06-29,8651 2017-06-30,8331 2017-07-01,8027 2017-07-02,7914 2017-07-03,7769 2017-07-04,7509 2017-07-05,7148 2017-07-06,6827 2017-07-07,6474 2017-07-08,6121 2017-07-09,5864 2017-07-10,5700 2017-07-11,5460 2017-07-12,5221 2017-07-13,5033 2017-07-14,4984 2017-07-15,4748 2017-07-16,4580 2017-07-17,4347 2017-07-18,4190 2017-07-19,4005 2017-07-20,3992 2017-07-21,3863 2017-07-22,3674 2017-07-23,3492 2017-07-24,3247 2017-07-25,3206 2017-07-26,3198 2017-07-27,3097 2017-07-28,3003 2017-07-29,2915 2017-07-30,2766 2017-07-31,2687 SPECIFIC SITE NOTES: GENERAL NOTES: - Days 1-10 are from the CBRFC deterministic model. This uses 5 days of precipitation forecasts and 10 days of temperature forecasts. These are updated daily and will change as the weather forecast changes, so there is increasing uncertainty past days 3-5. - Days 11 and beyond are from the Ensemble Prediction Model (ESP). This model is driven primarily by climatology for the 1981-2015 period. This guidance is probabilistic and used the 50% exceedance value. It is best to use this as a possible pattern of flow into the future as opposed to an exact value that will occur. - An abrupt change in guidance may occur at the switch from the daily model to the ESP model, some possible reasons are: - The daily model is using a temperature forecast that is either much above or below normal before reverting to normal temperatures in ESP. - If there is regulation (reservoirs, diversions, etc.) above the forecast point there may be differences between the two runs in how they are being handled. Please check with CBRFC forecasters for details on specific forecast points.